Construction Snap Shots - August 2012

The library annex is “wrapped” in plastic as construction begins on the second and third floors of building 5 in preparation for the Universal Community Behavioral Health of Bellefonte to move in.

     

Demolition of the ceiling on the 3rd floor.


Repair begins on the floor.

     

Debris is taken out through a window.


3rd floor after ceiling demolition.

     

The foundation for the stairwell is dug out in the library annex.


Electrical conduit is installed.

     

An outside photo of some equipment.

 